Turn Key Grain Storage and Handling Projects 
   
Click each picture for an enlarged view.
 
Project 1
Optimum Engineering Solutions can design and construct complete turnkey grain handling storage and processing facilities including Grain Silos from the turning of the first soil to the finished operating facility.
 
Foundation construction includes filling the ring beam and compacting to strict quality assurance procedures.
 
Pouring of the concrete foundation for the Grain Silos which include trenches for the aeration system and unloading augers.
 
Construction nearing completion. Shows rail outloading station and cross conveyor in support gantry.
 
Completed project showing approach road over existing weighbridge.
 
Project completed including final installation and commissioning of the electrical system and control system.
   
Project 2
Optimum Engineering Solutions Pty Ltd has carried out many turnkey projects which include the design, site preparation, earth works, structural fabrication, mechanical manufacture, erection of equipment, electrical design and installation and final commissioning of the facility.
 
Site preparation and road works, including the construction of a loop road.
 
Back filling and compaction of the concrete foundations for 2,500 tonne storage silos.
 
Construction of bucket elevator boot pit and elevator tower foundations.
 
Construction of 2,500 tonne Cyclone silos. This project includes 8 silos for a total of 20,000 tonnes of wheat.
 
Rail outloading of wheat at 500 tonnes per hour at the completed complex.
 
Completed project showing dual intake systems of 250 tonnes per hour each. The system is remotely operated by way of three touch screens located in strategic locations around the plant.

Project 3 Grain Silos
Grain Silos and outloading.
 
Pre-assembly of mechanical equipment.
 
Installation of bucket elevator.
 
Installation of belt and buckets.
 
Installation of spouts.
 
Finished project from intake side.
 
Finished project from main road.
 
Project 4
Commencing erection of structural steel.
 
Erection of structural steel progressing.
 
Erection of main building steel complete.
 
Erection of awning steel complete.
 
Internal and external cladding complete.
 
Mechanical equipment being fitted out.
 
Finished project from east.
   
Finished project from north.
   
Some mechanical euipment interface.