| Turn
Key Grain Storage and Handling Projects |
| |
|
| Click
each picture for an enlarged view. |
| |
Project
1 |
 |
Optimum
Engineering Solutions can design and construct complete turnkey
grain handling storage and processing facilities including Grain Silos from the turning
of the first soil to the finished operating facility. |
| |
|
 |
Foundation
construction includes filling the ring beam and compacting to
strict quality assurance procedures. |
| |
|
 |
Pouring
of the concrete foundation for the Grain Silos which include trenches for the aeration
system and unloading augers. |
| |
|
 |
Construction
nearing completion. Shows rail outloading station and cross
conveyor in support gantry. |
| |
|
 |
Completed
project showing approach road over existing weighbridge. |
| |
|
 |
Project
completed including final installation and commissioning of
the electrical system and control system. |
| |
|
Project
2
|
 |
Optimum
Engineering Solutions Pty Ltd has carried out many turnkey projects
which include the design, site preparation, earth works, structural
fabrication, mechanical manufacture, erection of equipment,
electrical design and installation and final commissioning of
the facility. |
| |
|
 |
Site
preparation and road works, including the construction of a
loop road. |
| |
|
 |
Back
filling and compaction of the concrete foundations for 2,500
tonne storage silos. |
| |
|
 |
Construction
of bucket elevator boot pit and elevator tower foundations. |
| |
|
 |
Construction
of 2,500 tonne Cyclone silos. This project includes 8 silos
for a total of 20,000 tonnes of wheat. |
| |
|
 |
Rail
outloading of wheat at 500 tonnes per hour at the completed
complex. |
| |
|
 |
Completed
project showing dual intake systems of 250 tonnes per hour each.
The system is remotely operated by way of three touch screens
located in strategic locations around the plant. |
Project
3 Grain Silos |
|
Grain Silos
and outloading. |
|
|
|
Pre-assembly
of mechanical equipment. |
|
|
|
Installation
of bucket elevator. |
|
|
|
Installation
of belt and buckets. |
|
|
|
Installation
of spouts. |
|
|
|
Finished
project from intake side. |
|
|
|
Finished
project from main road. |
|
|
Project
4
|
 |
Commencing
erection of structural steel. |
| |
|
 |
Erection
of structural steel progressing. |
| |
|
 |
Erection
of main building steel complete. |
| |
|
 |
Erection
of awning steel complete. |
| |
|
 |
Internal
and external cladding complete. |
| |
|
 |
Mechanical
equipment being fitted out. |
| |
|
 |
Finished
project from east. |
| |
|
 |
Finished
project from north. |
| |
|
 |
Some
mechanical euipment interface. |